Maintenance Planning follows a continuous release model, so their new features become available as soon as they are ready.
-
Maintenance Planning for maintenance planners
- Recap on recent improvements to make planning easier
- What is coming in December?
- Dedicated webpage for Migration O-Prognose to Maintenance Planning
- UX Improvements - Find the right information with fewer steps
- Import and export of multiple objects
- Tasks code – Use standard STABU codes or your own task coding
- Generate SIM monument template directly from your maintenance plan
- Trace indexation and keep Reference (library) unit prices updated
- Updating prices, cycles, units and task names according to the newest references - Actualization
- Send tasks to Asset without a linked construction-part
- Inspection App for inspectors
Maintenance Planning for maintenance planners
Recap on recent improvements to make planning easier
Info
The previous release strengthened data exchange, migration, reporting and usability. Together, these changes lay the foundation for the December improvements.
Already delivered
Immediate feedback when requesting reports: Immediate confirmation, progress tracking and improved report output.
Improved data migration from O-Prognose to Maintenance Planning: O-Prognose task history comments and NEN 2767 risk priority scores are carried over. As well as the NEN2767-2 2025 updates.
Share data with less manual work: Dedicated external exports (75-year plan, maintenance provision, Ortec Finance WALS/SAM, Bryder MJOP and Metafoor VBS) and generic 75 years data dump.
What is coming in December?
Info
The December release focuses on easier everyday work, complete inspections using the mobile App, more precise cost calculations and controlled updates to planning data.
Overview of what is new in December 2026
Continuous Delivery: UX Improvements: Clearer messages, more filters, easier grid setup, and import and export of multiple objects at once.
Inspection App - Sync Status Screen: Detailed overview of photo uploads before an inspection is finalized.
More control over costs and coding: STABU task codes, new SIM (Monuments) export and overhead costs applicable at task level.
Controlled updates and transfers: Indexation history, reference updates and more flexible task transfers to Spacewell Asset.
Dedicated webpage for Migration O-Prognose to Maintenance Planning
Info
O-Prognose is the previous generation of Maintenance Planning, used for some 30 years. Since October 2026, it has officially been replaced by Maintenance Planning, its web-based SaaS successor, which already has around 200 customers. More than 1,000 O-Prognose customers now start migrating, and a dedicated webpage gives everyone involved all the information they need to move to Maintenance Planning.
- As a user migrating from O-Prognose to Maintenance Planning
- I want to follow clear tutorials and videos for my workflows and migration
- So that I can get started and complete common tasks more independently
Benefits
- Follow practical, step-by-step guidance
- Learn through videos and detailed tutorials
- Find help with the migration from O-Prognose without needing support or consultancy
UX Improvements - Find the right information with fewer steps
Info
Clearer export messages, expanded report filters, and column search with a select-all option make common planning actions easier to complete.
- As a user working with reports and grids
- I want to find the fields I need and understand export progress
- So that I can configure my view and continue working without unnecessary repeat actions
Benefits
- Search columns and select all available fields
- Focus report output with more filters
- Know when an export is already processing
How is the feature made available? Automatically available to you as soon as the release is rolled out
Import and export of multiple objects
Info
Work with a selection of objects from the Objects management, extending the current one-object-at-a-time export approach to a more practical multi-object workflow.
- As a user
- I want to import or export multiple objects
- So that in one action I get the expected result, instead of export/import object per object
Benefits
- Import or export multiple objects and share them across tenants
- Reduce repetitive import and export steps
- Make portfolio data exchange more practical
How is the feature made available? Automatically available to you as soon as the release is rolled out
Tasks code – Use standard STABU codes or your own task coding
Info
You can use the standard classification or personalize task coding to match your organization's way of working, giving more freedom to organize and identify maintenance activities.
- As a maintenance planner
- I want to use standard STABU task codes or add my own task codes
- So that I can classify maintenance work in a way that fits my organization's needs
Benefits
- Use standard STABU codes at task level commonly used in the Netherlands
- Add your own codes to reflect your organization's terminology and structure
- Make tasks easier to identify and organize
- Generate a SIM (Monuments) Excel template based on STABU codes
How is the feature made available? Configuration required
Generate SIM monument template directly from your maintenance plan
Info
The new SIM export prepares maintenance data for subsidy applications for national monument buildings in the Netherlands. It populates the worksheet of the SIM template with tasks from Maintenance Planning, using the first two digits of each task's STABU code for the required classification.
- As a planner responsible for national monument buildings in the Netherlands
- I want to export maintenance tasks into the SIM template
- So that I can prepare a maintenance subsidy application without entering the same data again manually
Benefits
- Use Maintenance Planning data when preparing a SIM subsidy application
- Populate the required worksheet with tasks from Maintenance Planning
- Use STABU task codes for the required classification
- Reduce manual entry and the risk of copying mistakes
How is the feature made available? Automatically available to you as soon as the release is rolled out
Trace indexation and keep Reference (library) unit prices updated
Info
Indexation already exists in Maintenance Planning and it is simply the annual adjustment of prices to reflect the current situation. An audit trail now shows completed indexations, and a separate “Index references” option lets you update unit prices in your reference libraries.
- As a user maintaining standard unit prices
- I want to review past indexations and index my updated reference libraries
- So that I can keep unit prices updated and check which objects have already been updated and when
Benefits
- Check objects, index date, user and settings
- Keep present and future planning costs up to date with the current economy
- Perform indexation using filters
- Keep reference and object indexation separate
Disclaimer: The screenshots show mockups, as implementation is underway during the mid-November sprint. The final interface may differ.
How is the feature made available? Automatically available to you as soon as the release is rolled out
Updating prices, cycles, units and task names according to the newest references - Actualization
Info
Actualization now compares tasks with a selected reference and lets you choose which prices, cycles, units or names to update in one or more objects.
- As a planner updating task information
- I want to compare reference values and select the changes to apply
- So that I can update standard amounts and task details without overwriting data I want to keep
Benefits
- Match tasks by task ID or task name
- Review differences before applying changes
- Update only the fields you choose
- Keep your data consistent
Disclaimer: The screenshots show mockups, as implementation is underway during the mid-November sprint. The final interface may differ.
How is the feature made available? Automatically available to you as soon as the release is rolled out
Send tasks to Asset without a linked construction-part
Info
Tasks could already be sent from Maintenance Planning to Asset. Now they can also be transferred when their construction part is not linked, and the task description includes the relevant construction part information.
- As a maintenance planner sending work activities to Asset
- I want to transfer a task without first linking its construction part
- So that I can pass on the work without a mandatory link with a construction part
Benefits
- Avoid blocking transfers on a missing part link
- Avoid storing irrelevant data in Asset
- Identify the relevant part information in the task description
How is the feature made available? Automatically available to you as soon as the release is rolled out
Inspection App for inspectors
Inspection App – Sync screen - Status
Info
In the existing Inspection App, a submission summary now shows the upload status. The inspection is only finalized automatically after all photos have uploaded, which helps when the user has connection issues.
- As an inspector using the Inspection App
- I want to see photo upload progress before submission finishes
- So that my inspection arrives in Maintenance Planning with every photo I took
Benefits
- See which inspections are still uploading
- Keep photographic evidence for all inspections performed
- Know when submissions are completed
- Keep track of the status of inspections
How is the feature made available? Automatically available to you as soon as the release is rolled out